特级毛片在线大全免费播放,无码丰满熟妇juliaann与黑人,999精品免费视频观看,亚洲精品自偷自拍无码

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国内久久毛片| 久久中文字幕日韩无码视频 | 日日摸夜夜摸狠狠摸婷婷| 成人性爱视频在线观看| 无码视频在线观看一区二区| AV在线免费观看无码| 8x海外华人成人免费视频| 欧美人在线一区二区三区| av网在线看| 久久精品国产亚洲AV大全相关| 四虎永久在线精品免费网址| 97色色亚洲| 午夜不卡欧美AAAAAA在线观看| 久久 国产 综合| 人人欧美人人| 琪琪色原网站在线观看| 无码不卡的中文字幕视频| 少妇性饥渴xxxⅹ开放| 99偷拍精品视频| 岛国精品一区免费视频在线观看 | 免费看男女做羞羞的事网站| 午夜视频无码| 亚洲国产一区二区三区最新| 久久不见久久见免费影院www| 国产老头老太一级毛片| 九七视频精品免费| 国产一级毛片卡| 亚洲性爱网址| 国产午夜偷精品偷伦| 亚洲成av人片高潮喷水| 看成年全黄大色黄大片| 九九热免费在线视频| 国产成人免费高清激情视频| 久久99精品福利久久久久久| 欧美一级做a爰片久久高潮| 18禁免费无码无遮挡不卡网站| 私人毛片免费高清影视院| 和岳每晚弄的高潮嗷嗷叫视频| 人人艹艹人人| 久久精品国产亚洲一区二区三区| 国产女人操逼|