特级毛片在线大全免费播放,无码丰满熟妇juliaann与黑人,999精品免费视频观看,亚洲精品自偷自拍无码

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


?

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry??
and slurry for each passage. All these information can be printed according to pile numbers.

国产中文字幕日韩精品| 亚欧无码av在线| 年日韩激情国产自偷亚洲| 日韩区一区二区三| 男人天堂亚洲天堂| 91精品久久久久久久久无码果冻| 国产精品18久久久久网站| 性少妇VideOseXfreeXXX片中国| AV一本大道香蕉大在线| 亚洲无av中文字幕在线| 超碰在线95| 国产超碰人人做人人爱ⅴa| 国产人与zoxxxx另类| 亚洲老熟女性亚洲| 婷婷六月丁香一区二区| 国产aⅴ人妻互换一区二区| 操逼一二三区| 绯色AⅤ一区二区三区在线播放| 欧洲精品无码一区二区三区在线播放| 粗鸡吧操逼国产| 日韩 成人精品无码专区| 开心五月激情综合婷婷| 国产不卡一区不卡二区| 国产精品人妻久久无码不卡| 五月丁香六月香| 黑森林福利视频导航 | 汇聚亚洲欧美动漫另类| 国产激情二区| 国产高清精品自在线看| av免费不卡国产观看| 久久久久9999| 手机在线电影AV| 国产精品页| 色婷婷夜夜躁狠狠躁麻豆免费 | 中字无码av电影在线观看网站| 久久99精品国产自在现线| 爆乳熟妇一区二区三区霸乳漫画| 淫荡的少妇av| 亚洲欧美日韩愉拍自拍美利坚| 色综合天天综合欧美综合| 国产麻豆视频一区二区|